| Projects
S No |
Owner’s Name |
Nature of Work/Location |
Year |
|
1 |
Agro tools |
FEA Analysis and Design Modification of a Biogas Storage Dome |
2002 |
|
2 |
Lasmo |
FE Structural Analysis and Site Supervision of an Oil Rig |
2002 |
|
3 |
Infocad |
Design Automation of Door and Windows |
2003 |
|
4 |
Epec |
Structural and Foundation Designing and On-Site Fabrication Supervision of Storage Tank (5 Pieces)
Shell Dia= 6.9M, Shell Height= 8M |
2004 |
|
5 |
Karachi Shipyard |
Designing of Gear Box for a 5 Axis Milling Machine |
2004 |
6 |
Ulbritch’s |
Reverse Engineering of Hand Grenade |
2004 |
7 |
Olayan |
Designing and On-Site Fabrication Supervision of Storage Tank
Shell Dia= 5.5M, Shell Height= 6.7M |
2007 |
8 |
Structural and Foundation Designing and On-Site Fabrication Supervision of Storage Tank
Shell Dia= 3.7M, Shell Height= 6.7M |
2007 |
9 |
Structural and Foundation Designing and On-Site Fabrication Supervision of Storage Tank
Shell Dia= 8M, Shell Height= 9.4M |
2007 |
10 |
Structural and Foundation Designing and On-Site Fabrication Supervision of Storage Tank
Shell Dia= 7.5M, Shell Height= 7.4M |
2007 |
11 |
Structural and Foundation Designing and On-Site Fabrication Supervision of Pressure Vessel
Dia= 1.3M, Vessel Length= 6.5M Internal Vessel Pressure= 558 Kpag |
2007 |
12 |
Structural and Foundation Designing and On-Site Fabrication Supervision of Pressure Vessel
Vessel Dia= 2.44M, Vessel Length= 3.988M Internal Pressure= 215 Kpag |
2007 |
13 |
Structural and Foundation Designing and On-Site Fabrication Supervision of Pressure Vessel
Vessel Dia= 4.9M, Vessel Length= 17.8M Internal Pressure= 458 Kpag |
2007 |
14 |
Structural and Foundation Designing and On-Site Fabrication Supervision of Pressure Vessel
Vessel Dia= 1.8M, Vessel Length= 23.9M Internal Pressure= 383 Kpag |
2007 |
15 |
Structural and Foundation Designing and On-Site Fabrication Supervision and FEA Analysis of Pressure Vessel 13501-A
Vessel Dia= 7.8M, Vessel Length= 17.93M Internal Pressure= 1036 Kpag |
2009 |
16 |
Structural and Foundation Designing and FEA Analysis and On-Site Fabrication Supervision of Pressure Vessel 13501-B
Vessel Dia= 7.8M, Vessel Length= 17.93M Internal Pressure= 1036 Kpag |
2009 |
17 |
Structural and Foundation Designing and FEA Analysis and On-Site Fabrication Supervision of Pressure Vessel 13502-A
Vessel Dia= 2.0M, Vessel Length= 10.5M Internal Pressure= 1920 Kpag |
2009 |
18 |
Structural and Foundation Designing and FEA Analysis and On-Site Fabrication Supervision of Pressure Vessel 13502-B
Vessel Dia= 2.0M, Vessel Length= 10.5M Internal Pressure= 1925 Kpag |
2009 |
19 |
Structural and Foundation Designing and FEA Analysis and On-Site Fabrication Supervision of Pressure Vessel 13503
Vessel Dia= 5.7M, Vessel Length= 14.24M Internal Pressure= 3666 Kpag |
2009 |
20 |
Structural and Foundation Designing and FEA Analysis of Pressure Vessel 41D01-A
Vessel Dia= 1.6M, Vessel Length= 19.1M Internal Pressure= 4517 Kpag |
2009 |
21 |
Structural and Foundation Designing and FEA Analysis and On-Site Fabrication Supervision of Pressure Vessel 41D01-B
Vessel Dia= 1.6M, Vessel Length= 19.1M Internal Pressure= 5000 Kpag |
2009 |
22 |
Structural and Foundation Designing and FEA Analysis and On-Site Fabrication Supervision of Pressure Vessel 41D02-A
Vessel Dia= 7.2M, Vessel Length= 24.1M Internal Pressure= 2805 Kpag |
2009 |
23 |
Structural and Foundation Designing and FEA Analysis and On-Site Fabrication Supervision of Pressure Vessel 41D02-B
Vessel Dia= 7.2M, Vessel Length= 24.1M Internal Pressure= 3200 Kpag |
2009 |
24 |
Structural and Foundation Designing and FEA Analysis and On-Site Fabrication Supervision of Pressure Vessel 41D05-A
Vessel Dia= 5.3M, Vessel Length= 12.6M Internal Pressure= 814 Kpag |
2009 |
25 |
Structural and Foundation Designing and FEA Analysis and On-Site Fabrication Supervision of Pressure Vessel 41D05-B
Vessel Dia= 5.3M, Vessel Length= 12.6M Internal Pressure= 959 Kpag |
2009 |
26 |
Prime Site |
Designing of Billboard UNBALANCED 15’X45’ Foundation and Structure |
2003 |
27 |
Siemens |
Designing and Construction Supervision of Transformer Canopy Protection Roofings 15 Nos |
2003 |
28 |
Proctor & Gamble |
Designing and Construction Supervision of Inventory Racks |
2003 |
29 |
Building Extension, Designing and Construction Supervision |
|
30 |
Avery |
Designing of Weigh Bridge 3M X 18M |
2004 |
31 |
Al-Tariq Construction (Pvt) Ltd |
Designing and Construction Supervision of Several Road Projects |
2004 |
32 |
Huzefa Engineering |
Designing of Weigh Bridges 3M X 10M 11 Nos |
2003 |
33 |
Siemens |
Designing and Fabrication of Monorail Structure |
2004 |
34 |
Sefec Engineering |
Designing and Construction Supervision of Industrial Buildings |
2004 |
35 |
Prime Site |
Designing of Bi-Panel 30’ X 100’ Billboard, 17 Nos |
2004 |
36 |
JB School |
Designing of Mono bridge between two buildings |
2004 |
37 |
Shehzad Brothers |
Designing and Fabrication of GSM Towers, 47 Nos |
2005 |
38 |
Shaheen Engineering |
Architectural and Structural Designing and Construction Supervision of Industrial and Administration Building |
2004 |
39 |
Shaheen Engineering |
Designing of Industrial Steel Shed and Foundation |
2004 |
40 |
H & H Technofab |
Designing of Steel Structural Support for Chandelier 2.5 tons |
2004 |
41 |
MOBILINK |
Foundation, Structural, Architectural, Electrical, Earthing and Plumbing Designing and Construction Supervision on Followimg Sites:
QTA-5791, KHI-5460, KHI-5464, KHI-5470, KHI-5480, KHI-5475, QTA-5775, QTA-5789, QTA-5790, KHI-5461 |
2005 |
42 |
PAKTEL |
Foundation, Structural, Architectural, Electrical, Earthing and Plumbing Designing and Construction Supervision on Following Sites, S-HYD-0188, S-HYD-0189, S-HYD-0182, S-HYD-0190, S-KTR-0139 |
2004 |
43 |
ALANDICK |
Foundation, Structural, Architectural, Electrical, Earthing and Plumbing Designing and Construction Supervision on Following Sites 1KKZ-615A, 1KHD-101C, 1KHD-205C, 1KHD-305B, 1KHD-404A, 1KHD-503A, 1KHD-405B, 1KHD-208B, 1KKX509A, 1KHD-404B, IKHD-101A, IKHD-205A, IKHD-306C, IKHD-109B, 1KKZ-213A, 1KKZ-424B, 2KMH-101 A, 2KMT-101 A, 2KHM-101 A, 2KHL-101 A, 2KSB-101 A, 2KSK-101 A, 2KSG-102 A, 2KSK-101 A, 2KSQ-101 A, 2KSG-102 A, 2KSS-101 A, 2KSD-101 A, 2KSG-101 A, IKKX-311 A, 1KKZ-426 A, 1KKX-407 B, 1KKZ-204 A, IKKQ-101 A, IKKQ-106 A, IKKQ-108 A, IKKQ-108 A, IKKQ-302 A, IKKQ-303 B, IKKQ-311 A, IKKQ-315 A, IKKQ-318 A, IKKQ-321 C, IKKQ-323, IKKQ-410 A, IKKQ-503 A, IKKQ-507 A, IKKQ-525 B, IKKX-401 B, IKKX-402 A, IKKX-404 A, IKKX-409 A, IKKX-412 A, IKKX-612 A, IKKZ-205 A, IKKZ-418 A, IKKZ-421 B, IKKZ-433 B, S-LRK-0164, S-DRI- 0193, S-LRK- 0192, 1KHD-306C, 1KHD-503A |
2004 |
44 |
LeBLANC |
Foundation, Structural, Architectural, Electrical, Earthing and Plumbing Designing and Construction Supervision on Following Sites
S-KHI0318, S-KHI0302, S-KHI 0308, S-SDD- 0149 |
2005 |
45 |
UFONE |
Foundation, Structural, Architectural, Electrical, Earthing and Plumbing Designing and Construction Supervision on Following Sites:
2760 4823 2280 2161 1922 8865 9082 3261 1734 9961 1312 9938 1461 1482 1619 1622 1498 1495 1622 1619 1618 1617 1589 1542 1724 9877 9770 1348 1336 1337 1331 1335 1353 2867 2975 9904 1788 9893 8716 1880 7787 1268 1225 8772 9835 9820 9795 9794 1860 R008 8991 9935 9962 2561 1569 2865 8792 8978 8777 2985
2835 8717 8644 9777 9779 9744 9546 9245 9345 9310 9941 9421 9888 9931 9874 9856 9774 9456 9419 1711 1163 8177 8993 9382 2836 2566 2984 2966 7206 8321 8320 2176 2230 2509 2927 1153 1152 1311 1307 1306 9704 9890 2658 2786 2850 2842 2805 9490 9474 1298 1296 2977 8560 8375 2767 2770 1213 1181 2749 2992 8318 8367 8327 N0003 8371 3665 8968 8959 8915 8642 2710 9345 9905 9907 9875 1152 1298 1163 1322 1336 1353 1713 1716 9905 9935 9961 2481 0613 7149 1616 1734 9875 9893 9907 9938 9962 1788 1996 9770 9835 9877 9904 9931 9941 2658 2065 2004 2578 9967 2614 2611 2610 2608 2595 2963 2589 2588 2583 2574 2576 2573 2576 2573 2570 2569 2568 2561 2560 2559 2557 2552 2538 2609 2508 2489 2457 2456 2420 2295 2292 2268 2230 2254 2214 2189 2710 2726 2743 2749 2753 2751 2754 2771 2786 8064 8071 8160 8176 8177 8560
8574 8575 2798 2805 2806 2835 2850 2865 2867 2871 2874 2885 2913 2927 2929 2963 2964 2975 2966 2977 2984 2985 2968 2992 2996 2997 8020 2038 8753 8895 8896 R008 R005 2968 8643 8714 8715 8728 8737 8787 8740 8742 9545 8999 8998 8994 8993 8989 8983 8978 8972 8969 8968 8954 8953 8951 8939 8932 9308 8924 8923 8919 8918 8901 8897 8901 8897 2290 8058 2542 2534 8108 8109 9507 9516 9335 1705 1552 9336 7123 3814 2551 2546 1920 9500 1164 7223 9476 9490 9406 7206 7202 7210 9406 7226 3812 3813 7146 7225 3812 7226 2709 8139 8055 7226 2709 8139 8055 2507 2621 2904 2243 2487 2474 9243 9515 2310 8580 2861 2414 2470 2413 2993 2788 2862 8122 2431 8554 2210 2464 2412 2784 2261 8518 2554 2856 2712 2393 2460 2950 8039 2410 8940 8946 2226 2274 2376 2713 2995 8148 2623 2346 8118 2363 1319 6194 6522 6812 1555 0209 9969 1816 8032 2232 1852 5259 7315, 7132,1836, 8685, 8651, 2229, 2438, 2372, 2582, 8586 |
2006
TO
2009 |
46 |
Quebee |
Foundation, Structural, Architectural, Electrical, Earthing and Plumbing Designing and Construction Supervision on Sites as follows:
AKWC-154, MDKA-2005, MDKA-2021, MDKA-2044, MDKA-2073, AKWD-146, MDKA-2605, MDKA-6340, AKMB-118, AKMB-090, AKMB-094, AKMB-066, AKMB-133, AKWC-154, |
2006 |
47 |
World Call |
Foundation, Structural, Architectural, Electrical, Earthing and Plumbing Designing and Construction Supervision on Sites with IDs as follows:
S-KHI-16, S-KHI-2, S-KHI-6, S-KHI-7, S-KHI-17, S-KHI-22, S-KHI-23, S-KHI-74, S-KHI-75, S-KHI-78, S-KHI-55, S-KHI-59 |
2006 |
48 |
|
Design and Construction Supervision of Bungalow in North Karachi |
2001 |
49 |
|
Design and Construction Supervision of Bungalow in Phase 7, DHA |
2006 |
50 |
|
Bungalow Design and Construction Supervision in Phase 8, DHA |
2009 |
52 |
|
Bungalow Design and Construction Supervision in Phase 8, DHA |
2009 |
This list needs to be updated as Sanafafe has done more than 1000 projects including Site Supervision with companies of national and international standings.
|